Results 1 to 10 of 11

Thread: More progress

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Senior Member
    Join Date
    Aug 2011
    Location
    Virginia Beach Va
    Posts
    426

    More progress

    I figured I would share some of the work Dave MILLER is doing the lower half of my front slam panel was totally shot but the top with the vin plate was in geat shape so before the blasting they removed the lower
    Half well this is what they did with sheet metal and skillsName:  IMG_3565.jpg
Views: 619
Size:  81.9 KB
    Doug Lehman
    Member #2825
    1966 912



    1978 911SC Targa fun in the sun

  2. #2
    Senior Member
    Join Date
    Aug 2011
    Location
    Virginia Beach Va
    Posts
    426
    Name:  IMG_1696.jpg
Views: 589
Size:  87.6 KBHere is some more pictures of a few more repairs that have been done
    Attached Images Attached Images  
    Doug Lehman
    Member #2825
    1966 912



    1978 911SC Targa fun in the sun

  3. #3
    Senior Member
    Join Date
    Aug 2011
    Location
    Virginia Beach Va
    Posts
    426

    Getting things done

    The floors are out !!! Front end work 90% done !!! AS you can see a bit of tunnel work,a few flanges added. The heater pipes have some surface rust but are solid. WE are applying SEM Product to stop ant further corrosion.
    Attached Images Attached Images           
    Doug Lehman
    Member #2825
    1966 912



    1978 911SC Targa fun in the sun

  4. #4
    Senior Member 9er's Avatar
    Join Date
    Apr 2010
    Location
    Adelaide Australia
    Posts
    831
    Nice work, good pictures.

  5. #5
    Senior Member
    Join Date
    Aug 2011
    Location
    Virginia Beach Va
    Posts
    426
    Here is an update on more work done on prep for the complete pan to be installed

    Feed back is welcome
    Attached Images Attached Images          
    Doug Lehman
    Member #2825
    1966 912



    1978 911SC Targa fun in the sun

  6. #6
    Senior Member
    Join Date
    Aug 2011
    Location
    Virginia Beach Va
    Posts
    426
    Name:  DSCN5035.jpg
Views: 251
Size:  78.5 KBThe floor is finally installed.
    A look into the “smuggler’s box.” The opening for the steering coupler was mildly altered to match the original floor Name:  DSCN5032(1).jpg
Views: 275
Size:  87.1 KB Porsche ran beads of weld on some areas of the pinch weld flanges.
    You can also see one of the two brackets welded to the floor and pinch weld. Are they for A/C lines
    Name:  DSCN5029.jpg
Views: 274
Size:  82.1 KBName:  DSCN5042(1).jpg
Views: 253
Size:  76.8 KB fused pinch weld flanges increase the strength and stiffness in those areas Name:  DSCN5027.jpg
Views: 274
Size:  83.1 KBName:  DSCN5030(1).jpg
Views: 274
Size:  93.1 KBName:  DSCN5031(1).jpg
Views: 387
Size:  89.0 KBName:  DSCN5034.jpg
Views: 270
Size:  95.6 KB
    Last edited by CDOUGLEHMAN; 06-21-2019 at 08:08 PM.
    Doug Lehman
    Member #2825
    1966 912



    1978 911SC Targa fun in the sun

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Message Board Disclaimer and Terms of Use
This is a public forum. Messages posted here can be viewed by the public. The Early 911S Registry is not responsible for messages posted in its online forums, and any message will express the views of the author and not the Early 911S Registry. Use of online forums shall constitute the agreement of the user not to post anything of religious or political content, false and defamatory, inaccurate, abusive, vulgar, hateful, harassing, obscene, profane, sexually oriented, threatening, invasive of a person's privacy, or otherwise to violate the law and the further agreement of the user to be solely responsible for and hold the Early 911S Registry harmless in the event of any claim based on their message. Any viewer who finds a message objectionable should contact us immediately by email. The Early 911S Registry has the ability to remove objectionable messages and we will make every effort to do so, within a reasonable time frame, if we determine that removal is necessary.