Results 1 to 4 of 4

Thread: correct date stamp on Fuchs for April '73 delivery

  1. #1
    Senior Member swisscheese's Avatar
    Join Date
    Jan 2003
    Location
    The Netherlands
    Posts
    396

    correct date stamp on Fuchs for April '73 delivery

    What would be the correct month / date for the Fuchs wheels, for a '73 April delivery 911S ? I know there are quite a few parts with date stamps (not sure if they've ever been listed?) and probably have different months of manufacturing before being mounted on the car.

    For the Fuchs wheels, would that be March '73, or even before then?
    Any info appreciated..

    Tom
    911S 1973
    Early 911S Registry #176

  2. #2
    Serial old car rescuer Arne's Avatar
    Join Date
    Aug 2011
    Location
    Eugene, OR
    Posts
    1,993
    Typically, 1-3 months prior to the car's build month, I've been told. Go by build date, not delivery.
    - Arne
    Current - 2018 718 Cayman, Rhodium Silver, PDK

    Sold - 1972 911T coupe, Silver Metallic; 1984 911 Carrera coupe, Chiffon white; 1973 914 2.0, Saturn Yellow; 1984 944, Silver Metallic

  3. #3
    Senior Member swisscheese's Avatar
    Join Date
    Jan 2003
    Location
    The Netherlands
    Posts
    396
    Quote Originally Posted by Arne View Post
    Typically, 1-3 months prior to the car's build month, I've been told. Go by build date, not delivery.
    April was delivery from the factory; So production date should be March.

    Was wondering what the date stamps on the Fuchs should be (does anyone know, from real-life examples?), as they were "standard" items, instead of accessories, that would have a longer time between manufacturing and assembly on the car.
    911S 1973
    Early 911S Registry #176

  4. #4
    Righteous Indignation 70SATMan's Avatar
    Join Date
    Jul 2003
    Location
    Santa Cruz, CA
    Posts
    4,315
    There is no right answer for “should be” except the wheel date shouldn’t exceed the build date. But what if a wheel was replaced at the the dealer? Could have been later,,,

    . How many wheels were being delivered to the factory in each shipment? Porsche would have had a delivery schedule set up to lead their production AND supply spare parts around the world at the same time. Your car could have been at the tail end of a batch or at the beginning of a new batch. Personally I wouldn’t sweat a 1-3 months lead (if at all). Depending on the originality of your car, pull some gauges and look at the date stamps and match that.

    Remember, wheels were stamped in the month made so, a wheel could have been made and shipped in the first week of a month or made the last day of the month and not shipped to the factory for another 30 day’s.
    Michael
    “Electricity is really just organized lightning”

    -Dusty 70S Coupe
    -S Registry #586

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Message Board Disclaimer and Terms of Use
This is a public forum. Messages posted here can be viewed by the public. The Early 911S Registry is not responsible for messages posted in its online forums, and any message will express the views of the author and not the Early 911S Registry. Use of online forums shall constitute the agreement of the user not to post anything of religious or political content, false and defamatory, inaccurate, abusive, vulgar, hateful, harassing, obscene, profane, sexually oriented, threatening, invasive of a person's privacy, or otherwise to violate the law and the further agreement of the user to be solely responsible for and hold the Early 911S Registry harmless in the event of any claim based on their message. Any viewer who finds a message objectionable should contact us immediately by email. The Early 911S Registry has the ability to remove objectionable messages and we will make every effort to do so, within a reasonable time frame, if we determine that removal is necessary.